Installation, Mating & Maintenance Guide
Maximize equipment lifespan and prevent field failures. Access step-by-step operational procedures, torque values, and essential maintenance protocols for technicians.
Operational Procedures & Troubleshooting
How do I install the Bulkhead (BCR) onto my housing?
The bulkhead interface is the most critical leak path.
How tight should I screw the Locking Sleeve?
Do not confuse the locking sleeve with the sealing mechanism.
How do I properly mate the connectors? (Push, Don’t Twist)
The “Twist” is the #1 killer of subsea connectors.
What pre-mating inspection should I perform?
A 30-second inspection saves hours of downtime.
Er du klar til at tjekke vores produktionskapacitet?
Download vores fulde virksomhedspræsentation, eller planlæg en virtuel rundvisning på fabrikken i dag.

Gennemprøvede løsninger i marken
Et udstillingsvindue for vores vellykkede samarbejde med globale partnere inden for maritim robotteknologi, energi og forskning. Hvert projekt afspejler vores engagement i nul-lækage-integritet og driftssikkerhed.
Start dit undervandsprojekt med HYSF
Uanset om du har brug for et hurtigt tilbud på standardstik eller en kompleks, tilpasset kabelsamling, er vores ingeniørteam klar til at hjælpe. Forvent et teknisk svar inden for 12 timer.

John Zhang
ADMINISTRERENDE DIREKTØR
- info@hysfsubsea.com
- +86 13942853869




- Vores team besvarer dine forespørgsler inden for 12 timer.
- Dine oplysninger vil blive behandlet strengt fortroligt.