How do I install the Bulkhead (BCR) onto my housing?

Ensure the mounting surface is smooth (Ra 1.6) and clean. Install the connector with the provided O-ring and Washer. Tighten the nut to the recommended torque (e.g., 4.5 – 5.5 Nm for 7/16-20 UNF). Do not use thread locker (Loctite) on the plastic threads unless specified, as some chemicals attack the connector body.

The bulkhead interface is the most critical leak path.

  • Hole Prep: The through-hole should have a small chamfer (0.5mm) to help the O-ring seat.
  • Washer: Always place the washer between the nut and the inside wall of your housing to prevent the nut from digging into the material while turning.
  • Torque: Use a torque wrench. Under-tightening causes leaks; over-tightening extrudes the O-ring.
  • Orientation: Ensure the “Key” or Guide Pin is oriented correctly (usually facing up) before tightening the nut, so your cables hang naturally.
Billede af John Zhang

John Zhang

(CEO og ledende ingeniør)
E-mail: info@hysfsubsea.com
Med over 15 års ekspertise inden for undervandsforbindelsesteknologi leder jeg HYSF's R&D-team med at designe højtryksløsninger (60MPa). Mit fokus er at sikre pålidelighed uden lækage for ROV'er, AUV'er og offshore-instrumentering. Jeg fører personligt tilsyn med valideringen af vores prototyper af brugerdefinerede forbindelser.

Har du et komplekst teknisk spørgsmål?

Gennemprøvede løsninger i marken

Et udstillingsvindue for vores vellykkede samarbejde med globale partnere inden for maritim robotteknologi, energi og forskning. Hvert projekt afspejler vores engagement i nul-lækage-integritet og driftssikkerhed.

Start dit undervandsprojekt med HYSF

Uanset om du har brug for et hurtigt tilbud på standardstik eller en kompleks, tilpasset kabelsamling, er vores ingeniørteam klar til at hjælpe. Forvent et teknisk svar inden for 12 timer.

John Zhang

ADMINISTRERENDE DIREKTØR

Jason Liu
Kevin Wang
Cindy Chen
Lily Li
Demo af kontaktformular