Proper installation requires: (1) Clean all surfaces, (2) Inspect O-rings, (3) Apply appropriate lubricant, (4) Hand-tighten then torque to specification, (5) Test electrical continuity before deployment. Always follow manufacturer torque specifications and use proper tools.

Installation Steps

  1. Preparation: Clean mating surfaces with fresh water
  2. Inspection: Check O-rings for damage
  3. Lubrication: Apply silicone grease to O-rings
  4. Mating: Align keyways, hand-tighten
  5. Torquing: Use spanner wrench to specified torque
  6. Testing: Verify electrical continuity

Nous contacter

Technical inquiries: info@hysfsubsea.com

Image de John Zhang

John Zhang

(PDG et ingénieur en chef)
Courriel : info@hysfsubsea.com
Avec plus de 15 ans d'expertise dans la technologie des interconnexions sous-marines, je dirige l'équipe R&D de HYSF dans la conception de solutions à haute pression (60MPa). Mon objectif est d'assurer une fiabilité sans fuite pour les ROV, les AUV et les instruments offshore. Je supervise personnellement la validation de nos prototypes de connecteurs personnalisés.

Vous avez une question technique complexe ?

Des solutions éprouvées sur le terrain

Une vitrine de nos collaborations fructueuses avec des partenaires mondiaux dans les domaines de la robotique marine, de l'énergie et de la recherche. Chaque projet reflète notre engagement en faveur d'une intégrité sans fuite et d'une fiabilité opérationnelle.

Lancez votre projet sous-marin avec HYSF

Que vous ayez besoin d'un devis rapide pour des connecteurs standard ou d'un assemblage complexe de câbles sur mesure, notre équipe d'ingénieurs est prête à vous aider. Une réponse technique est attendue dans les 12 heures.

John Zhang

PDG

Jason Liu
Kevin Wang
Cindy Chen
Lily Li
Démonstration du formulaire de contact