คำตอบอย่างรวดเร็ว
Standard products: 2-4 weeks
Custom connectors: 4-8 weeks
Large volume orders: 6-10 weeks
Detailed Lead Time Breakdown
1. Standard Off-the-Shelf Products
For standard connector models that are in stock or in production:
- Sample orders (1-10 pcs): 2-3 weeks
- Small batches (10-50 pcs): 3-4 weeks
2. Custom Engineered Connectors
For custom configurations (special pin count, cable length, materials):
- Design and prototyping: 1-2 weeks
- Production: 3-4 weeks
- Testing and QC: 1 week
- Total: 5-7 weeks
3. High-Volume OEM Orders
For production runs of 100+ units:
- 100-500 pcs: 6-8 weeks
- 500-1000 pcs: 8-10 weeks
- 1000+ pcs: 10-12 weeks (negotiable)