How do I install the Bulkhead (BCR) onto my housing?

Ensure the mounting surface is smooth (Ra 1.6) and clean. Install the connector with the provided O-ring and Washer. Tighten the nut to the recommended torque (e.g., 4.5 – 5.5 Nm for 7/16-20 UNF). Do not use thread locker (Loctite) on the plastic threads unless specified, as some chemicals attack the connector body.

The bulkhead interface is the most critical leak path.

  • Hole Prep: The through-hole should have a small chamfer (0.5mm) to help the O-ring seat.
  • Washer: Always place the washer between the nut and the inside wall of your housing to prevent the nut from digging into the material while turning.
  • Torque: Use a torque wrench. Under-tightening causes leaks; over-tightening extrudes the O-ring.
  • Orientation: Ensure the “Key” or Guide Pin is oriented correctly (usually facing up) before tightening the nut, so your cables hang naturally.
John Zhang  の写真

ジョン・チャン

(CEO兼リード・エンジニア)
Eメール:info@hysfsubsea.com
海底相互接続技術における15年以上の専門知識を生かし、高圧(60MPa)ソリューションの設計においてHYSFの研究開発チームをリードしています。ROV、AUV、およびオフショア計装の漏れのない信頼性を確保することに重点を置いています。また、カスタムコネクターのプロトタイプの検証を監督しています。.

複雑な技術的質問をお持ちですか?

エンジニアリングのヘルプが必要ですか?

当社のエンジニアは通常12時間以内に返信いたします。.

現場で実証済みのソリューション

世界的な海洋ロボット、エネルギー、研究パートナーとのコラボレーションを紹介します。すべてのプロジェクトは、リークゼロの完全性と運用信頼性に対する当社のコミットメントを反映しています。.

海底プロジェクトを始めよう ハイシエラフォーマット

標準コネクタの迅速な見積もりから複雑なカスタムケーブルアセンブリまで、当社のエンジニアリングチームがお手伝いいたします。技術的な回答は12時間以内を予定しています。.

ジョン・チャン

CEO(最高経営責任者

ジェイソン・リュー
ケビン・ワン
シンディ・チェン
リリー・リー
お問い合わせフォームデモ