빠른 답변
Proper installation requires: (1) Clean all surfaces, (2) Inspect O-rings, (3) Apply appropriate lubricant, (4) Hand-tighten then torque to specification, (5) Test electrical continuity before deployment. Always follow manufacturer torque specifications and use proper tools.
Installation Steps
- Preparation: Clean mating surfaces with fresh water
- 검사: Check O-rings for damage
- Lubrication: Apply silicone grease to O-rings
- Mating: Align keyways, hand-tighten
- Torquing: Use spanner wrench to specified torque
- 테스트: Verify electrical continuity
문의하기
Technical inquiries: info@hysfsubsea.com









