How do I install the Bulkhead (BCR) onto my housing?

Ensure the mounting surface is smooth (Ra 1.6) and clean. Install the connector with the provided O-ring and Washer. Tighten the nut to the recommended torque (e.g., 4.5 – 5.5 Nm for 7/16-20 UNF). Do not use thread locker (Loctite) on the plastic threads unless specified, as some chemicals attack the connector body.

The bulkhead interface is the most critical leak path.

  • Hole Prep: The through-hole should have a small chamfer (0.5mm) to help the O-ring seat.
  • Washer: Always place the washer between the nut and the inside wall of your housing to prevent the nut from digging into the material while turning.
  • Torque: Use a torque wrench. Under-tightening causes leaks; over-tightening extrudes the O-ring.
  • Orientation: Ensure the “Key” or Guide Pin is oriented correctly (usually facing up) before tightening the nut, so your cables hang naturally.
صورة John Zhang

جون زانغ

(الرئيس التنفيذي والمهندس الرئيسي)
البريد الإلكتروني: info@hysfsubsea.com
مع أكثر من 15 عامًا من الخبرة في مجال تكنولوجيا التوصيل البيني تحت سطح البحر، أقود فريق البحث والتطوير في HYSF في تصميم حلول الضغط العالي (60 ميجا باسكال). وينصب تركيزي على ضمان موثوقية عدم التسرب للمركبات التي تعمل تحت سطح البحر والمركبات ذاتية القيادة والمركبات ذاتية الحركة والأجهزة البحرية. وأشرف شخصياً على التحقق من صحة نماذج الموصلات المخصصة لدينا.

هل لديك سؤال تقني معقد؟

حلول مثبتة في الميدان

عرض لتعاوننا الناجح مع شركائنا العالميين في مجال الروبوتات البحرية والطاقة والأبحاث. يعكس كل مشروع التزامنا بسلامة عدم التسرب والموثوقية التشغيلية.

ابدأ مشروعك تحت سطح البحر مع HYSF

سواء كنت بحاجة إلى عرض أسعار سريع للموصلات القياسية أو مجموعة كبلات مخصصة معقدة، فإن فريقنا الهندسي مستعد للمساعدة. توقع الحصول على رد فني في غضون 12 ساعة.

جون زانغ

الرئيس التنفيذي

جيسون ليو
كيفن وانغ
سيندي تشين
ليلي لي
عرض نموذج الاتصال التوضيحي