How do I install the Bulkhead (BCR) onto my housing?

Ensure the mounting surface is smooth (Ra 1.6) and clean. Install the connector with the provided O-ring and Washer. Tighten the nut to the recommended torque (e.g., 4.5 – 5.5 Nm for 7/16-20 UNF). Do not use thread locker (Loctite) on the plastic threads unless specified, as some chemicals attack the connector body.

The bulkhead interface is the most critical leak path.

  • Hole Prep: The through-hole should have a small chamfer (0.5mm) to help the O-ring seat.
  • Washer: Always place the washer between the nut and the inside wall of your housing to prevent the nut from digging into the material while turning.
  • Torque: Use a torque wrench. Under-tightening causes leaks; over-tightening extrudes the O-ring.
  • Orientation: Ensure the “Key” or Guide Pin is oriented correctly (usually facing up) before tightening the nut, so your cables hang naturally.
Bilde av John Zhang

John Zhang

(administrerende direktør og ledende ingeniør)
E-post: info@hysfsubsea.com
Jeg har over 15 års erfaring med undervannskoblingsteknologi og leder HYSFs FoU-team som utformer høytrykksløsninger (60 MPa). Jeg fokuserer på å sikre pålitelighet uten lekkasje for ROV-er, AUV-er og offshore-instrumentering. Jeg fører personlig tilsyn med valideringen av våre tilpassede prototyper.

Har du et komplisert teknisk spørsmål?

Utprøvde løsninger i felten

Et utstillingsvindu for vårt vellykkede samarbeid med globale partnere innen marin robotikk, energi og forskning. Hvert prosjekt gjenspeiler vår forpliktelse til null lekkasjeintegritet og driftssikkerhet.

Start ditt subseaprosjekt med HYSF

Enten du trenger et raskt tilbud på standardkontakter eller en kompleks, spesialtilpasset kabelmontering, står ingeniørteamet vårt klart til å hjelpe deg. Du kan forvente et teknisk svar innen 12 timer.

John Zhang

ADMINISTRERENDE DIREKTØR

Jason Liu
Kevin Wang
Cindy Chen
Lily Li
Demo av kontaktskjema