Quick Answer
Standard connectors: 1-2 weeks. Custom connectors: 4-8 weeks depending on complexity. Rush production available (+30% fee) can reduce custom lead time to 2-4 weeks.
Lead Time Breakdown
Standard Products
| Product Type | Lead Time | Notes |
|---|---|---|
| In-stock connectors | 1-3 days | Ready to ship |
| Standard catalog items | 1-2 weeks | Regular production |
| Standard cable assemblies | 2-3 weeks | Includes cable prep |
Custom Products
| Customization Level | Lead Time | Rush Available |
|---|---|---|
| Minor modifications | 2-4 weeks | Yes (1-2 weeks) |
| Custom pin configuration | 4-6 weeks | Yes (2-3 weeks) |
| Full custom design | 6-10 weeks | Yes (4-5 weeks) |
Rush Production Options
- Standard rush (+30%): 50% lead time reduction
- Express rush (+50%): 60-70% lead time reduction
- Emergency (+100%): Maximum priority, case-by-case
Planning Tips
For projects with tight deadlines, consider using standard connectors with custom cable assemblies as a compromise. This can reduce lead time while still meeting application requirements.